Product Overview
The Vesgantti 38.5' Accent Chair Black is a Sofas & Couches product. It features modern armchair sofa - this versatile single-seater sofa effortlessly complements.
Key Features
- Modern Armchair Sofa - This versatile single-seater sofa effortlessly complements living rooms, bedrooms, or studies, featuring a sleek silhouette that harmonizes with both contemporary and traditional decor. Its minimalist design ensures seamless integration into any space, making it a stylish yet functional addition to diverse interior aesthetics
- Ergonomic & Comfortable - The spring cushions of this reading chair absorb the impact of daily use, preventing rapid wear and tear and extending the life of the footstool. With a 20.9-inch seat depth, its generously sized seat offers ample support for both sitting and propping up feet, enhancing relaxation with exceptional pressure relief that makes every moment feel effortlessly luxurious
- FSC Certified Solid Wood - Made with materials from well-managed forests that support sustainable forestry practices. This accent chair is known for its sturdiness and solidity, with a maximum weight capacity of 440lbs. Additionally, the single sofa chair features non-slip protective backing on the bottom of the legs, providing stability and preventing damage to flooring
- Durable Corduroy Fabric - This corduroy sofa chair features distinct parallel ridges for a smooth, plush feel. Its velvety surface and modern design exude luxury, while the thick, wear-resistant build ensures lasting comfort. Available in four colors—note slight hue variations due to monitors and lighting
- Easy Assembly - Complete with tools and detailed instructions, assembly is quick and easy. Color/size may vary slightly due to display/manual measurement. Upon unpacking, cushions may appear compressed; allow 24-48 hours to fully fluff. Pat gently for faster recovery and enhanced comfort. Contact us with questions
Why Choose the Vesgantti 38.5' Accent Chair Black
The Vesgantti 38.5' Accent Chair Black offers modern armchair sofa - this versatile single-seater sofa and ergonomic & comfortable - the spring cushions of. These features make the Vesgantti 38.5' Accent Chair Black a strong option in the Sofas & Couches category.
Best For
The Vesgantti 38.5' Accent Chair Black is best suited for everyday sofas & couches needs.
Quick Summary
The Vesgantti 38.5' Accent Chair Black is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: Yes. Seat Depth: 20.9 inches. Seat Height: 7 Inches. Weight Limit: 440 Pounds. Price: $280.48.
Product Specifications
| Specification | Details |
|---|---|
| Brand | Vesgantti |
| Assembly Required | Yes |
| Seat Depth | 20.9 inches |
| Seat Height | 7 Inches |
| Weight Limit | 440 Pounds |
| Seating Capacity | 1.0 |
| Product Dimensions | 31.5'D x 38.5'W x 35'H |
| Item Weight | 64 Pounds |
| Type | Standard |
| Color | 38.5' - 1 Seater Black |
