Product Overview
The Vesgantti 159' Large Modular Sectional Sofa is a Sofas & Couches product. It features modular sectional, custom layout: this 159' u-shaped sectional offers full.
Key Features
- Modular Sectional, Custom Layout: This 159' U-shaped sectional offers full modular flexibility for any living space. Arrange as a 2-seat loveseat, 3-seat L-shaped sofa, or full 4-seat L/U-shaped setup. Modules can also be separated or transformed into a sofa bed, giving you versatile seating for any room
- Oversized Deep Seat Comfort: Relax in true cloud-like comfort. Extra-deep seats and ergonomic height make lounging, stretching, and family movie nights effortless and cozy. Perfect for everyday comfort and gatherings
- Durable Spring & Foam Support: Built with high-density foam and reinforced sinuous springs, this sectional provides balanced support and long-lasting durability. Resists sagging and ensures consistent comfort for all body types
- Soft & Durable Corduroy Fabric: Upholstered in premium corduroy, this boneless sectional is soft, breathable, and resistant to wear and scratches. Family- and pet-friendly, combining comfort with practical style
- Convertible with Movable Ottomans: Includes two movable ottomans to create chaise lounges, L-shaped, or U-shaped setups. Adaptable design lets you entertain, relax, or even create a sofa bed configuration with ease
- No Assembly, Easy Setup: Ships in 6 manageable boxes for safe delivery. No tools or complicated instructions needed—just place the modules and allow foam to fully expand within 72 hours for instant, hassle-free comfort
Why Choose the Vesgantti 159' Large Modular Sectional Sofa
The Vesgantti 159' Large Modular Sectional Sofa offers modular sectional, custom layout: this 159' u-shaped sectional and oversized deep seat comfort: relax in true cloud-like. These features make the Vesgantti 159' Large Modular Sectional Sofa a strong option in the Sofas & Couches category.
Best For
The Vesgantti 159' Large Modular Sectional Sofa is best suited for: everyday comfort and gatherings.
Quick Summary
The Vesgantti 159' Large Modular Sectional Sofa is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: No. Seat Depth: 21.7 inches. Seat Height: 17.3 Inches. Weight Limit: 1200 Pounds. Price: $1022.98.
Product Specifications
| Specification | Details |
|---|---|
| Brand | Vesgantti |
| Assembly Required | No |
| Seat Depth | 21.7 inches |
| Seat Height | 17.3 Inches |
| Weight Limit | 1200 Pounds |
| Seating Capacity | 6 |
| Product Dimensions | 79.6'D x 159'W x 32.3'H |
| Item Weight | 46 Pounds |
| Type | Sectional |
| Color | 159' - 4 Seater + 2 Ottoman Grey |
